- 1 -
HRIF – U of A
Retrofit, mostly insulation and mechanical some now 15 years ago.
- 2 -
Confederation Bridge
One of the first and only privately funded infrastructure projects in Canada. A unique building
approach which saw most of the piers cast on land and floats into position was a first. The project was
financed by the builder and the tolls from passage over 25 years. To find out more about this unique
project and the builder contract EPCM.
- 3 -
High Voltage Test Facility
High voltage test facility was unique in that its blast proof.
Construction: EPCM works with the structural fabrication to address unique blast proof environment.
EPCM professionals document delay and cost escalation.
- 4 -
CNRL
Horizon and other CNRL engagements by EPCM professionals:
- Quantity variations and delay
- O&M turnarounds S.I.S.
- Supply chain, dispute resolution
- 5 -
Fort St. John Hospital
Successful resolution of delays differing conditions and cost increases for foundations.
- 6 -
K&S Potash Mine – Bethune Saskatchewan
Analysis of productivity unit cost, delay associated with pre-treatment facility.
- 7 -
Unit Tosco Refinery – Long Beach, California
Major retrofit and turnaround, including O&M and cost and schedule control. The same firm designed
and built the hydraulic lift system for the replica of the articulate Titanic in the DiCaprio movie.
- 8 -
Circle Drive Bridge - Saskatoon
Post contract design changes resulting in delay and cost increases.
9- Parsons Creek Interchange and twinning of Highway 63 to Fort MacMurray
Delays, cost escalation, differing conditions and dispute resolution successfully.
- 10 -
Petro Canada Alberta
Delays, cost escalation, differing conditions and dispute resolution successfully.
- 11 -
Fortis Upsizing of all LNG Pipelines – Greater Vancouver Area, Burnaby, Coquitlam, etc.
Unknown utility obstruction and constrained work areas resulted in cost and delay and cost increases.
Successful results.
- 12 -
Circle Drive
Post contract design change and delays successfully resolved.
- 13 -
Upsizing LNG
Results to delays and cost escalation.
- 14 -
St. Louis Bridge
Indigenous concerns required relocation of approaches. This resulted in major rework of the bridge
girders and transportation and increased costs of delay and transportation. Successfully settled with
acting Minister of Transportation to a negotiated settlement.